Fuzzy Job Shop Problems
Here we attach the instances that are refered to in the paper "Benchmarks for Fuzzy Job Shop Problems".
They are organised as follows:
- Proposed instances: This folder contains all the instances used in the paper
- Original instances: Fuzzy instances created from scratch.
- Fuzzified instances: Fuzzy instances that were built based on deterministic ones.
- Unsolved instances: Contains the instances that are highlighted in the paper (section 5.3) as not optimally solved.
- Challenging instances: Contains the instances that are highlighted in the paper (section 5.3) as the most challenging.
- New benchmark: New set of instances proposed in the paper (section 6)
File format:
=======================================================
The instances are formatted as follows:
- The first two lines indicates the number of jobs
- The next two lines indicates the number of resources/machines
- The following is the machine requierement matrix
- The number in row "r" and column "c" is the machine required by the "c"-th task of job "r".
- The last matrix cotains the task durations
- The TFN in row "r" and column "c" is the duration of the "c"-th task of job "r".
Example:
---------------------------
In the fuzzy instance S6.3 we have 6 jobs and 6 resources
Task 2 of Job 1 has to be scheduled in machine 5 and takes (1,2,4) time units.